Valuation models
Power tolling agreements
Each day's option to run capacity at a heat rate and variable cost, with emissions, priced exactly as a spark spread option on that day's power and gas forwards, less the toll payments; intrinsic and extrinsic value, expected generation and power and gas deltas.
Inputs
Results
Every input and result then gets a + calc button.
Explain this result
Get a plain-English reading of the numbers above and what drives them.
Preview: rule-based reading. AI-assisted explanations run on the analytics core.
Methodology
Conventions
- Each day is a spark spread option: power less heat rate times gas less the running cost, for capacity times hours.
- Daily forwards are read off the monthly curves; tolls are paid at each month end.
- No start-up costs or minimum run times: an upper bound on a real plant's flexibility.
References
- Deng, Johnson and Sogomonian (2001)
Formulas
- Day
- Q D E[max(P − hG − c, 0)]