Definition
In a tolling agreement, a buyer pays a power plant's owner a fixed capacity fee and in return gets the right to supply fuel and take the power. The buyer runs the plant whenever the spark spread, power price minus fuel cost, is high enough. It is a strip of spark spread options, with operating limits.
History
Tolling agreements spread in the US in the late 1990s as power markets were deregulated and trading firms such as Enron and later banks wanted exposure to generation without owning plants. They are now common in Europe and US power markets.
Examples
Running a plant
A plant has a heat rate of 7.5 and variable cost of 3 per MWh. With power at 55 and gas at 6, the margin is 55 − 7.5 × 6 − 3 = 7, so the plant runs. If gas rises to 7.5, the margin is negative and it stays off.
Variations
- Power tolling
- Daily or hourly spark spread options with plant limits.
Valuation methods
Each period is valued as a spark spread option on power and gas forwards, and the agreement as their sum, less the capacity fee. Start-up costs and minimum run times reduce the value relative to a plain strip of options.
Models on RiskAtoms
| Instrument | Pricing models |
|---|---|
| Power tolling agreement | Exact two-asset spread (conditional Black-76) Kirk spread approximation |